The project consists of the construction of the new interchange on highway A14 Bologna-Bari-Taranto, at the Bologna Fair, as part of the upgrade of highway system and Bologna bypass.
The project includes the construction of six overpasses in the service of interchange branches for the intersection of these branches with the highway track and with the adjacent Bologna ring road.
Piacentini Ingegneri has worked as a consultant of the enterprise that carried out the work, for the preparation of the construction project.
Of 6 overpass 2 are single spans straight-axis, 2 single span curved axis, 1 continuous three-span straight axis and 1 two-span continuous curved axis.
All are made of mixed steel-concrete and have a system of supports with elastomeric isolators in neoprene reinforced to improve their resistance to earthquake.
Bologna, Italy
City, Country
Emilia Romagna Region
Client
2006 – Built
Date